Asia Pacific excluding China to add 12.1GW annually by 2022 – Windpower Monthly

Windpower MonthlyAsia Pacific excluding China to add 12.1GW annually by 2022Windpower MonthlyThe government now plans to tender at least 10GW per year, and to have 60GW of wind power capacity installed by 2022. The shift to a tendering system has also seen prices fall — from a pre-auction feed-in tariff (FiT) rate of INR 4-6kWh ($0.058-0.087 and more »

Read More: Asia Pacific excluding China to add 12.1GW annually by 2022 – Windpower Monthly